Job card

HAMI-SULEP-EME

Machine class

Haul Truck

Method

Surface Mining

Site area

Lephalale, Waterberg, Limpopo

Emergency Surface Mining Haul Truck Fleet Maintenance in Lephalale

Haul Trucks working surface mining around Lephalale carry a specific thermal problem: continuous 24-hour haul cycles on ramp gradients with constant cab door cycling. Surface mining operations run wide, dispersed fleets across multiple pits, which makes mobile in-field HVAC capability more valuable than workshop-only capacity. Breakdown-driven intent. A cab over temperature limit stops production, so response time and first-visit fix rate are the only metrics that matter.

What the fleet maintenance covers

01

Asset register and per-unit HVAC history

02

Interval-based inspection aligned to service bays

03

Refrigerant handling and logging

04

Monthly fleet condition and risk reporting

Failure modes we expect on this machine

  • Condenser core blinded by haul road fines, causing high-side pressure spikes
  • Chafed or fatigue-cracked discharge hoses at the chassis-to-cab crossover
  • Failed cab pressuriser filters pulling dust across the evaporator
  • Clutch-cycle compressor bearing collapse from belt misalignment

Heat gap analysis · Lephalale

41°C

Ambient in pit

20°C delta to hold

21°C

Required cab temp

A system that has lost even 15% of its condenser capacity cannot bridge a 20°C gap. That is why fouled cores and marginal charge levels present as complete cooling failure on a Lephalale bench, and why we verify every repair with a measured delta-T under load rather than a gauge reading at idle.

Lephalale logistics

Our workshop and parts store is in Lephalale, so common compressors, driers, hoses and blower assemblies are held locally. In-pit units are dispatched from town, and most breakdowns are attended the same shift.

Large-scale open-cast coal, overburden stripping fleets, dragline support plant, power station coal handling and the contractor fleets that service them.

Questions about this work in Lephalale

Request this work

Step 1 of 3

Which equipment is affected?